How long a yacht interior takes to upholster, and why
It is nearly always asked in the first conversation, and it has two answers. The short one is the number of days the interior spends on the workshop bench. The long one is everything either side of that: measuring, choosing materials, waiting for them to arrive and finding the slot. Here are both, with what happens at each stage and what you can do to save time.
By Royal Stitch · Published
Illustrative imageThe short figure and the long one
The short figure is the part the workshop controls: twelve to twenty bench days for a full yacht interior. That is actual work on the pieces, from the first pattern to the last seam.
The long figure is the one the owner lives with, from the first message to the day the boat has an interior again. It takes in the visit to measure, the quotation, the fabric or leather supplier’s lead time and a slot in the diary of a workshop that takes on few projects at once. Those depend on the boat, the materials and the queue, which is why no delivery date is promised before all of it has been seen.
For comparison, a full car interior is five to eight bench days. Same logic, fewer pieces, and nothing to measure on board.
First conversation
Which boat, which pieces, which material. In English or Spanish.
Measuring on board
Every piece measured and patterned on the boat.
Quotation and deposit
In writing, with materials and timing. 50% on acceptance.
Materials and diary
The supplier’s lead time, and a slot in a workshop that takes on few projects at once.
The bench
12 to 20 days’ work, by one pair of hands.
12–20 bench days: twelve at the least, up to twenty depending on length and number of pieces
Fitting and handover
The pieces go back aboard. The remaining 50%.
What happens on the bench
An interior is remade piece by piece, and every piece goes through the same hands and the same steps:
- Stripping and patterning
- The old cover comes off and each piece is patterned — on a boat almost none are square, or the same as the one opposite.
- Cutting
- The material is cut to the pattern, minding the direction of the cloth or how the hide is used.
- Sewing
- Seams, piping and topstitching. The stage that takes the most hours and tolerates hurry the least.
- Foam and covering
- New foam cut to size, and the cover fitted over it.
- Fitting
- The pieces go back aboard and are fitted in place.
What moves the figure between twelve and twenty
Mainly the boat’s length and the number of pieces: more boat means more seats, backrests and headboards. But also how much work each piece takes. A straight cushion is patterned and sewn faster than a curved one, a piped one or a quilted one; two boats of the same length can have twice as many pieces as each other.
There is one more reason, and it is structural: the work is done by a single upholsterer. The stages aren’t shared out to go faster; they follow one another. In return, the same hands pattern, cut, sew and fit, and nothing gets lost between one trade and the next.
What comes before and after
Three things come before the bench. Measuring on board, whenever the boat is accessible. A written quotation with materials and timing; on acceptance 50% is paid and the project goes into the diary. And the materials, which carry their supplier’s lead time: a particular colour or hide may not be in stock.
After the bench come fitting on board and handover, with the remaining 50%. If the boat is in a yard or with a refit company, the upholstery is fitted around their schedule: measured before the other trades arrive, fitted once they have gone.
Saving time without rushing the work
Hurry doesn’t show on the day of handover; it shows in the first season. What does shorten the wait is this:
- Commission out of season
- In autumn and winter the boat is in less use, and the work can be done before the season starts.
- Choose the materials early
- With samples in hand and a clear idea of how each area is used. The sooner it is decided, the sooner it is ordered.
- Keep the boat accessible
- For measuring and, at the end, for fitting. A late measure delays everything after it.
- Mention a refit
- If the boat is going into a yard, saying so from the start lets the upholstery fit the yard’s schedule.
The service
Want to know the timing for your boat?
The builder, the length and what you would like redone is enough for a first conversation. The actual timing goes in the quotation, once the boat has been seen.
Sources
The timings in this article are the workshop’s own, not an industry average: the bench days the workshop gives for its own work, with a single upholsterer.